Analysing Enabling Factors Affecting the On-site Productivity in Indian Construction Industry
Abstract
The growth in construction productivity is low and do not continue for a long span of time. The purpose of the present research paper is to analyse the factors affecting on-site construction productivity in Indian construction industry. The tools used for the analysis are reliability analysis to check the consistency of the data, Pearson correlation analysis to mathematically validate the factor analysis, and linear regression analysis to propose a framework of factors affecting construction productivity. The findings of the reliability analysis concludes that the all the factors having a value of more than 0.67, which is considered to be good for the study, and the findings of the study conclude that the most significant 3 attributes grouped in linear regression analysis change in scope (R2), revision in drawings (R15), and response to change orders (R3) having maximum impact over the construction productivity. The research paper attempts to provide an insight and better understanding of the factors affecting on-site construction productivity in India and the ways and means to control and improve construction productivity of construction projects.
"This paper is the revised version of the paper that has been published in the proceedings of the Creative Construction Conference 2018: Dixit, S., Mandal, S. N., Thanikal, J. V, & Saurabh, K. (2018). Critical Analysis of Factors Affecting the on-site Productivity in Indian Construction Industry, (July), 38–45. https://doi.org/10.3311/CCC2018-006"