[1]
Mályusz, L. and Varga, A. 2016. An Estimation of the Learning Curve Effect on Project Scheduling with Working Days Calculation. Periodica Polytechnica Architecture. 47, 2 (Jan. 2016), 104–109. https://doi.org/10.3311/PPar.10387.