Török, T. and Vattai, Z. (1988) “SEQUENCE PLANNING OF TASKS WITH IDENTICAL WORK PROCESSES FOR ACHIEVING THE SHORTEST POSSIBLE TIME OF REALIZATION ”,
Periodica Polytechnica Architecture
, 32(3-4), pp. 195–207.