[1]
Khanzadi, M. et al. 2016. Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA. Periodica Polytechnica Civil Engineering. 60, 2 (Jan. 2016), 169–180. https://doi.org/10.3311/PPci.7883.