[1]
Alizadeh Galdiani, M. et al. 2022. Investigation and Prioritization of Railway Reconstruction Projects by Using Analytic Hierarchy Process Approach Case Study: Kerman and Southeastern Areas in Iranian Railways. Periodica Polytechnica Civil Engineering. 66, 3 (Jan. 2022), 671–680. https://doi.org/10.3311/PPci.19543.