Albayrak, G. (2023) “Optimizing of Discrete Time-cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm”, Periodica Polytechnica Civil Engineering, 67(3), pp. 806–818. 10.3311/PPci.22156.