Khanzadi, M., Attar, A. M. and Bagherpour, M. (2016) “Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA”, Periodica Polytechnica Civil Engineering, 60(2), pp. 169–180. 10.3311/PPci.7883.