[1]
M. Zare Naghadehi and R. Mikaeil, “Optimization of Tunnel Boring Machine (TBM) Disc Cutter Spacing in Jointed Hard Rock Using a Distinct Element Numerical Simulation”, Period. Polytech. Civil Eng., vol. 61, no. 1, pp. 56–65, Jan. 2017.