Albayrak, G. “Optimizing of Discrete Time-cost Trade-off Problem in Construction Projects Using Advanced Jaya Algorithm”, Periodica Polytechnica Civil Engineering, 67(3), pp. 806–818, 2023. https://doi.org/10.3311/PPci.22156