Khanzadi, M., Attar, A. M., Bagherpour, M. “Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA”, Periodica Polytechnica Civil Engineering, 60(2), pp. 169–180, 2016. https://doi.org/10.3311/PPci.7883