Bosurgi, G., Pellegrino, O., Sollazzo, G. “Project Duration Evaluated Using Affine Arithmetic”, Periodica Polytechnica Civil Engineering, 61(3), pp. 412–420, 2017. https://doi.org/10.3311/PPci.8972