GESZTI, O. P. and REGULY, Z. (1969) “INVESTIGATIONS ON SIMULTANEOUS OPERATION OF A CLUSTER OF CIRCUIT-BREAKERS”, Periodica Polytechnica Electrical Engineering, 13(4), pp. 311–323.