[1]
Pilászy, G. et al. 2014. The Effect of Latency Increasing on the Realisation Cost in High Level Synthesis of Pipeline Systems. Periodica Polytechnica Electrical Engineering and Computer Science. 58, 2 (Jan. 2014), 37–42. https://doi.org/10.3311/PPee.7024.