[1]
G. Pilászy, G. Rácz, and P. Arató, “The Effect of Latency Increasing on the Realisation Cost in High Level Synthesis of Pipeline Systems”,
Period. Polytech. Elec. Eng. Comp. Sci.
, vol. 58, no. 2, pp. 37–42, Jan. 2014.