1.
Pilászy G, Rácz G, Arató P. The Effect of Latency Increasing on the Realisation Cost in High Level Synthesis of Pipeline Systems. Period. Polytech. Elec. Eng. Comp. Sci. [Internet]. 2014 Jan. 1 [cited 2024 May 6];58(2):37-42. Available from: https://pp.bme.hu/eecs/article/view/7024