[1]
Bokor, Z. 2012. Rail infrastructure costing based on multi-level full cost allocation. Periodica Polytechnica Transportation Engineering. 40, 1 (Jan. 2012), 3–9. https://doi.org/10.3311/pp.tr.2012-1.01.