[1]
Xu, W., Tan, Y., Sharma, B. and Wang, Z. (2020). Cyclic Timetable Scheduling Problem on High-speed Railway Line. Periodica Polytechnica Transportation Engineering. 48, 1 (2020), 31-38. https://doi.org/10.3311/PPtr.12312.