Xu, Wen, Yuyan Tan, Bishal Sharma, and Ziyulong Wang. 2020. “Cyclic Timetable Scheduling Problem on High-Speed Railway Line”.
Periodica Polytechnica Transportation Engineering
48 (1):31-38. https://doi.org/10.3311/PPtr.12312.