[1]
S. Korkulu and K. Bóna, “Integration of Ergonomic Aspects into Lot-sizing Model of the Production Line Supply Process Based on Relaxation Allowance and Maximum Endurance Time”, Period. Polytech. Transp. Eng., vol. 50, no. 2, pp. 205–215, Jan. 2022.