Xu, W., Tan, Y., Sharma, B., Wang, Z. (2020) “Cyclic Timetable Scheduling Problem on High-speed Railway Line”, Periodica Polytechnica Transportation Engineering, 48(1), pp. 31–38. https://doi.org/10.3311/PPtr.12312