UMBAU DER 150 MW DAMPFTURBINEN IN HEIZTURBINEN IM WÄRMEKRAFTWERK DONAU

Authors

  • B. CZINKÓCZKY

Abstract

This feasibility study is concerned with the transformation of three 150 MW condensing steam turbines, working in the Dunamenti Thermal Power Station, in extraction condensing turbines for the district heating of South Budapest. In the paper the main parameters of extraction working are given.

Keywords:

extraction condensing turbine, district heating

Citation data from Crossref and Scopus

How to Cite

CZINKÓCZKY, B. “UMBAU DER 150 MW DAMPFTURBINEN IN HEIZTURBINEN IM WÄRMEKRAFTWERK DONAU”, Periodica Polytechnica Mechanical Engineering, 35(3), pp. 169–175, 1991.

Issue

Section

Articles