Study on Construction Resource Optimization and Uncertain Risk of Urban Sewage Pipe Network

Authors

  • Xin Li
    Affiliation
    Departmen of Building Intelligence, Jiangsu Vocational Institute of Architectural Technology, Xuzhou 221116, China
  • Jian Huang
    Affiliation
    Xuzhou Hydraulic Engineering Construction Co., Ltd., Xuzhou 221006, China
  • Chunwei Li
    Affiliation
    Power China Eco-environmental Group Co., Ltd., Shenzhen 518102, China
  • Ning Luo
    Affiliation
    Sinohydro Engineering Bureau 7 Co., Ltd., Chengdu 610081, China
  • Wen Lei
    Affiliation
    Sinohydro Engineering Bureau 7 Co., Ltd., Chengdu 610081, China
  • Haiyuan Fan
    Affiliation
    Sinohydro Engineering Bureau 15 Co., Ltd., Xi’an, 710068, China
  • Yuan Sun
    Affiliation
    Departmen of Building Intelligence, Jiangsu Vocational Institute of Architectural Technology, Xuzhou 221116, China
  • Weiqi Chen
    Affiliation
    Departmen of Building Intelligence, Jiangsu Vocational Institute of Architectural Technology, Xuzhou 221116, China
https://doi.org/10.3311/PPci.18877

Abstract

With considering sewage pipe network upgrading projects in the “villages” in cities, the optimization of construction resources and the assessment of delay risks could be achieved. Based on the schedule-cost hypothetical theory, the mathematical model with constraint indicators was established to obtain the expression of optimal resource input, and conclude the method to analyze the schedule uncertainties. The analysis showed that cyclical footage of pipe could be regarded as a relatively fixed value, and the cost can be regarded as a function that depending on the number of working teams. The optimal number of teams and the optimal schedule occurred when the minimum total cost achieved. In the case of insufficient meteorological data, the Monte Carlo simulation method and uncertainty analysis method can be applied to assess the impact of rainfall on the total construction period, correspondingly the probability of such risk could be derived. The calculation showed that the risk of overdue completion varied significantly according to the construction starting time. It was necessary to take rainfall risk into consideration and make corresponding strategies and measures.

Keywords:

hypothetical theory, pipe network construction, resource optimization, uncertainty, risk analysis

Citation data from Crossref and Scopus

Published Online

2022-03-30

How to Cite

Li, X., Huang, J., Li, C., Luo, N., Lei, W., Fan, H. “Study on Construction Resource Optimization and Uncertain Risk of Urban Sewage Pipe Network”, Periodica Polytechnica Civil Engineering, 66(2), pp. 335–343, 2022. https://doi.org/10.3311/PPci.18877

Issue

Section

Research Article